Thursday, June 11, 2015

#420 High Bridge



High Bridge over the Harlem River
June 11, 2015, Rob Hickman, Keith Nelson

View on Unicycle NYC Bridge Tour Map at: unibridgetour.net

From Wikipedia:

The High Bridge (originally the Aqueduct Bridge) is a steel arch bridge, with a height of almost 140 feet (40 m) over the Harlem River, connecting the New York City boroughs of the Bronx and Manhattan. The eastern end is located in the Bronx near the western end of West 170th Street, and the western end is located in Highbridge Park in Manhattan, roughly parallel to the end of West 174th Street.

Completed in 1848, it is now the oldest bridge in New York City—although the steel arch that actually spans the Harlem River dates from a 1928 renovation. The bridge was closed to all traffic from the 1970s until its restoration which began in 2009. The bridge was reopened to pedestrians and unicycles on June 9, 2015.

The bridge is operated and maintained by the New York City Department of Parks and Recreation.

Originally designed as a stone arch bridge, the High Bridge had the appearance of a Roman aqueduct. Construction on the bridge was started in 1837, and completed in 1848 as part of the Croton Aqueduct, which carried water from the Croton River to supply the then burgeoning city of New York some 10 miles (16 km) to the south. It has a length of well over 2,000 feet (600 m). It was designed by the aqueduct's engineering team, led by John B. Jervis. James Renwick, Jr., who later went on to design New York's landmark Saint Patrick's Cathedral on Manhattan's Fifth Avenue, participated in the design.

The Croton Aqueduct had to cross the Harlem River at some point, and the method was a major design decision. A tunnel under the river was considered, but tunneling technology was in its infancy at the time, and the uncertainty of pursuing this option led to its rejection. This left a bridge, with the Water Commission, engineers and the public split between a low bridge and a high bridge. A low bridge would have been simpler, faster, and cheaper to construct. When concerns were raised to the New York Legislature that a low bridge would obstruct passage along the Harlem River to the Hudson River, a high bridge was ultimately chosen.

In 1928, in order to improve navigation in the Harlem River, the five masonry arches that spanned the river were demolished and replaced with a single steel arch of about 450 feet (140 m). Of the masonry arches of the original 1848 bridge, only one survives on the Manhattan side, while some ten survive on the Bronx side.

Use of the structure for water supply purposes ceased on December 15, 1949.

By 1954, The New York Times reported that the commissioner of the Department of Water Supply, Gas and Electricity said that "the bridge entailed serious problems of maintenance and vandalism." Robert Moses agreed to take responsibility for the bridge, which was transferred to the Parks Department in 1955. There were incidents, in 1957 and 1958, of pedestrians throwing sticks, stones, and bricks from the bridge, seriously injuring passengers on Circle Line tour boats which passed under the bridge. Concerns due to these incidents supposedly contributed to the bridge being closed as early as 1960, although other sources claim it was not closed until the early 1970s, when high crime and fiscal crisis lead to the contraction of many city services and public spaces.

The High Bridge was part of the first reliable and plentiful water supply system in New York City. As the City was devastated by cholera (1832) and the Great Fire in 1835, the inadequacy of the water system of wells-and-cisterns became apparent. Numerous corrective measures were examined. In the final analysis only the Croton River, located in northern Westchester County was found to be sufficient in quantity and quality to serve the needs of the City. The delivery system was begun in 1837, and was completed in 1848.

The Old Croton Aqueduct was the first of its kind ever constructed in the United States. The innovative system used a classic gravity feed, dropping 13 inches (330 mm) per mile and running 41 miles (66 km) into New York City through an enclosed masonry structure crossing ridges, valleys, and rivers. University Avenue was later built over the southernmost mainland portion of the aqueduct, leading to the bridge. The High Bridge soars 138 feet (42 m) above the 620-foot (190 m)-wide Harlem River, with a total length of 1,450 feet (440 m). The bridge was designed with a pedestrian walkway atop the Aqueduct and was not used for vehicular traffic. Though the carrying capacity was enlarged in 1861-62 with a larger tube, the bridge, obsolete due to opening of the New Croton Aqueduct, ceased to carry water in 1917. In the 1920s the bridge's masonry arches were declared a hazard to ship navigation by the United States Army Corps of Engineers, and the City considered demolishing the entire structure. Local organizations called to preserve the historic bridge, and in 1927 five of the original arches across the river were replaced by a single steel span, the remaining arches were retained.

In November 2006 the Department of Parks and Recreation announced that the bridge would reopen to pedestrians in 2009. This date was repeatedly put off. A $20 million renovation project would include strengthening the arch, improving staircases, cameras on both ends of the bridge, and boat beacon lights among other features.

In 2009 preliminary planning, funded by plaNYC, began for restoring the High Bridge. The High Bridge Coalition raised funds and public awareness to restore High Bridge to pedestrian and bicycle traffic, joining the Highbridge Parks in both Manhattan and the Bronx that together cover more than 120 acres (0.49 km2) of parkland, and providing a link in New York's greenway system. In early 2010 a contract was signed with Lichtenstein Consulting Engineers and Chu & Gassman Consulting Engineers (MEP sub-consultant) to provide designs for the restored bridge.

On January 11, 2013, the mayor's office announced the bridge would reopen for pedestrian traffic by 2014, but in August 2014, the open was postponed to spring of 2015. In May 2015, the Parks Department announced a July opening and a July 25 festival. The ribbon was cut for the restored bridge at about 11:30am, June 9, 2015, with the bridge open to the general public at noon.